Search criteria

Stockton aerial ropeway

Stockton aerial ropeway

In 1953 this aerial ropeway was built at Stockton in the Buller region to bring coal down from opencast mines. With renewed demand for Buller coal in the early 2000s, the ropeway has allowed for expanded production at Stockton.

Whai muri

Archives New Zealand - Te Rua Mahara o te Kawanatanga
Reference: Pictorial Parade 12. National Film Unit, 1953

Permission of Archives New Zealand Te Rua Mahara o te Kawanatanga must be obtained before any re-use of this material.




Kei tēnei kōrero

 


He kōrero anō mō...
Mineral Resources

 


View Te Ara in