Rock, limestone and clay


Previous item. Next item.
Next

Building the Roxburgh dam


Building the Roxburgh dam

Watch footage of the early stages of the construction of the Roxburgh dam. Construction of the first dam on the Clutha River was completed in 1956. Thousands of tonnes of concrete were slowly poured, creating the massive plug that held back the river. Demand for aggregate and concrete surged with big construction projects, especially during the dam-building era of the 1950s and 1960s.

About this item

Archives New Zealand - Te Rua Mahara o te Kāwanatanga

Permission of Archives New Zealand Te Rua Mahara o te Kāwanatanga must be obtained before any re-use of this material.




Biographies

Images & Media

The Story


In this story

 


More stories about...
Mineral Resources

 



Explore Te Ara
English Maori